Long Patchwork S-Curve Black
Long Patchwork S-Curve Black
Regular price
$450 USD
Regular price
$850 USD
Sale price
$450 USD
Shipping calculated at checkout.
Couldn't load pickup availability
1940s inspired bias-cut dress with deep v-neck opening. Mixed fabric qualities along the body give a patchworked feel - with high shine, matte crepe and a sheer panel at very bottom. Easy, forgiving body that drapes beautifully along the body. Bracelet length sleeves. Falls to ankle.
- 78% Viscose, 11% Rayon, 11% Polyester
-
1940's inspired long sleeve bias cut gown with deep V on front
- Matte and high sheen viscose patchwork detail throughout
- Drop shoulder
- Center seam on back
- Pull-on style
- Slim silhouette, fits true to size
- Will fall to the ankle on most
- Available in black
- Made in Korea
Sydney is 5'9" and wearing a size Small






