S-Curve Dress Lemon
S-Curve Dress Lemon
Couldn't load pickup availability
The S-Curve Dress in Lemon has a graphic multi-color floral print throughout. Produced in 100% Silk Georgette, the asymmetrical seam down the front and back of the dress gives the 'S' shape. Cut on the bias and fitted slightly at the waist, the dress will have a subtle drape over the shoulders and chest - falling right above the ankle on most. Flattering on the body - skims, doesn't hug.
- 100% Silk Georgette
- Asymmetrical seam down the front and back of the dress
- Cap sleeves
- High scoop neck
- Also available in Cinnamon
- Made in Korea
Aliz is 5'10" and wears our size Small




